We supplied Green Energy Origin Czech with a technological solution including structured cabling and a camera system designed for use in explosive environments. The contract also included an access system, optical networks, WiFi coverage of the premises, a parking system, and the delivery of a 6×3-meter monitoring wall. This was a comprehensive solution for a highly secure facility for the energy sector.